|
OWNER DETAILS
|
Owner Name(s)
(as shown on deed) *
|
|
Property Street Address *
|
Oakland FL 34787
|
Mailing Address *
|
|
Cell Phone *
|
|
Home Phone
|
|
Email *
|
|
|
|
|
PROPERTY CURRENT DETAILS
|
Photo of Property *
|
Upload RECENT photo of FRONT OF PROPERTY showing ALL of the following:
HOUSE, GARAGE, WALKWAY, DRIVEWAY, LANDSCAPE and SIDEWALK.
(For New Construction photo of vacant lot is acceptable).
3MB File Size Limit, please check file size before uploading
Example of House Photo
*NOTE: Applications without a recent house photo will be automatically rejected.*
|
|
|
|
APPLICATION DETAILS AND DESCRIPTION
|
|
DESCRIBE IN AS MUCH DETAIL AS POSSIBLE in the areas below information on the SCREEN ENCLOSURE to be reviewed by the Architectural Review Board (ARB).
Include photos, supporting documents and/or files relevant to your application by entering information, uploading files/documents and choosing from lists.
Upload a property lot survey showing details of Screen Enclosure construction.
Lot survey must show exact location of screen enclosure etc.
Include information on material type, color, finish pattern if applicable, measurements of screen enclosure and distances from lot boundary.
|
|
SCREEN ENCLOSURE
|
Application for *
|
Select relevant option for screen enclosure.
|
Details of Screen Enclosure *
|
Include details such as design, layout, size, measurements, placement, material, color, method of construction, etc.
|
Screen Enclosure Documentation *
|
Upload Screen Enclosure documentation with FULL details of project; listing material to be used, color, measurements, area of placement, construction method, etc.
3MB File Size Limit, please check file size before uploading
|
Property Lot Survey *
|
Upload property lot survey.
3MB File Size Limit, please check file size before uploading
Lot survey showing location of home, driveway, walkway and sidewalk.
Clearly show ALL construction information for screen enclosure include exact location with measurements and distance from lot boundaries and home, etc.
Click on image for larger view.
|
Upload Supporting Documents
|
Upload supporting documents, additional photos, as needed to describe construction, finish etc.
Include additional screen enclosure details such as color, placement, etc.
3MB File Size Limit, please check file size before uploading
|
Additional Supporting Documents
|
3MB File Size Limit, please check file size before uploading
|
Additional Supporting Documents
|
3MB File Size Limit, please check file size before uploading
|
Checklist *
|
Have you included the following Required Information for your Screen Enclosure project?
Clearly Describe ProjectLot SurveyMaterial to be Used for Screen EnclosureColor of Screen Frame FinishColor and Type of screens to be UsedDiagram/Site Map showing Exact Location of Screen Enclosure relevant to Bounders and HouseDiagram/Site Map showing Measurements of Screen Enclosure from Boundaries, Home and Swimming Pool (If application)
|
If applicable I understand that the ARB will use the Sherwin-Williams ColorSnap Match paint color matching device to check that the paint used matches the paint colors that were approved.
In making this request, I hereby agree to repair any damages caused to common or limited common areas as a result of this modification, alteration or addition and will restore these areas to their original condition within fourteen (14) days of completion of modification, alteration or addition to my property.
-
ALL NECESSARY GOVERNMENTAL PERMITS REQUIRED ARE A CONDITION OF APPROVAL
All requests must conform to all Zoning and Building Regulations
You must obtain all necessary permits if the Architectural Review Board approves your request
-
BEFORE YOU DIG:
Contact Sunshine 811.com, to locate all underground lines (established by Chap. 556 F.S., Underground Facility Damage Prevention & Safety Act.)
-
All approvals are subject to installation conforming to association documents, rules, regulations and guidelines.
-
The ARB committee has fourteen (14) days from application acceptance to review.
-
The ARB committee reserves the right to inspect the approved work to ensure it is completed according to the specified requirements.
-
This application is valid for ninety (90) days from date of approval.
-
If work is not completed within ninety (90) days of approval, a new ARB application must be submitted.