|
OWNER DETAILS
|
Owner Name(s)
(as shown on deed) *
|
|
Property Street Address *
|
Oakland FL 34787
|
Mailing Address *
|
|
Cell Phone *
|
|
Home Phone
|
|
Email *
|
|
|
|
|
PROPERTY CURRENT DETAILS
|
Photo of Property *
|
Upload RECENT photo of FRONT OF PROPERTY showing ALL of the following:
HOUSE, GARAGE, WALKWAY, DRIVEWAY, LANDSCAPE, FENCE/S and SIDEWALK.
(For New Construction photo of vacant lot is acceptable).
3MB File Size Limit, please check file size before uploading
Example of House Photo
*NOTE: Applications without a recent house photo will be automatically rejected.*
|
Current Roof Type *
|
Select Current Roof Type.
|
|
|
|
APPLICATION DETAILS AND DESCRIPTION
|
|
DESCRIBE IN AS MUCH DETAIL AS POSSIBLE in the areas below information on the SOLAR ROOF PANEL installation to be reviewed by the Architectural Review Board (ARB).
Include photos, supporting documents and/or files relevant to your application by entering information, uploading files/documents and choosing from lists.
Upload a property lot survey or roof plan showing details of roof project.
Plan must show current roof and all changes clearly depicted.
|
|
SOLAR ROOF PANELS
|
Application for *
|
Installation of Solar Roof Panel System.
|
Details of Project *
|
Include details such as type, location on roof, size, placement, area covered, exactly what is being installed, location of conduit installation etc.
|
Solar Roof Panels Documentation *
|
Upload solar roof panels project documentation with FULL details of project; list all details of how many solar panels will be installed and exact install location/s, size, also exact location of conduit installation (not in front of house) etc.
3MB File Size Limit, please check file size before uploading
|
Property Lot Survey or Roof Plan *
|
Upload property lot survey or roof plan showing Solar Roof Panels project installation details.
3MB File Size Limit, please check file size before uploading
Property lot survey or roof plan showing location of home, driveway, walkway, sidewalk and existing roof also location of solar roof panels installation and location of conduit installation (not front of home).
Clearly show ALL solar panel locations on roof, exactly location of conduits etc.
Click on image for larger view.
|
Upload Supporting Documents
|
Upload additional supporting documents, photos, as needed to describe solar roof panels installation.
3MB File Size Limit, please check file size before uploading
|
Additional Supporting Documents
|
3MB File Size Limit, please check file size before uploading
|
Additional Supporting Documents
|
3MB File Size Limit, please check file size before uploading
|
Checklist *
|
Have you included the following Required Information for your Solar Roof Panel installation?
|
If applicable I understand that the ARB will use the Sherwin-Williams ColorSnap Match paint color matching device to check that the paint used matches the paint colors that were approved.
In making this request, I hereby agree to repair any damages caused to common or limited common areas as a result of this modification, alteration or addition and will restore these areas to their original condition within fourteen (14) days of completion of modification, alteration or addition to my property.
-
ALL NECESSARY GOVERNMENTAL PERMITS REQUIRED ARE A CONDITION OF APPROVAL
All requests must conform to all Zoning and Building Regulations
You must obtain all necessary permits if the Architectural Review Board approves your request
-
BEFORE YOU DIG:
Contact Sunshine 811.com, to locate all underground lines (established by Chap. 556 F.S., Underground Facility Damage Prevention & Safety Act.)
-
All approvals are subject to installation conforming to association documents, rules, regulations and guidelines.
-
The ARB committee has fourteen (14) days from application acceptance to review.
-
The ARB committee reserves the right to inspect the approved work to ensure it is completed according to the specified requirements.
-
This application is valid for ninety (90) days from date of approval.
-
If work is not completed within ninety (90) days of approval, a new ARB application must be submitted.